With the RIB still being repaired, we’re using the “extra time” to fix all the little odds and ends on the boat. Becky and Laurie ripped out the old stained carpet and have been putting down new carpet tiles. My friend Jim Rowley had suggested carpet tiles so that individuals could be replaced if needed instead of ripping up the entire flooring.
My jobs today are fix the main toilet, paint POR15 on the front of the engine, and work on refinishing the transom. I do love wooden boats, but they are a huge amount of work.